BPH Energy Limited (ASX:BPH) Quarterly Activities Report
BPH Energy Limited (ASX:BPH) is pleased to present the Quarterly Activities for the period.
BPH Energy Limited (ASX:BPH) is pleased to present the Quarterly Activities for the period.
Central Petroleum Limited (ASX:CTP) (FRA:C9J) (OTCMKTS:CNPTF) advises that the new West Mereenie 29 (WM29) well has been tied-in and commenced flowing to sales on 20 January 2025.
BPH Energy Limited (ASX:BPH) and Bounty Oil & Gas NL (ASX:BUY) as the PEP 11 Joint Venture announce that they have on 17 January 2025 been given notice by the National Offshore Petroleum Titles Administrator (NOPTA) that the Joint Authority has refused the Joint Venture Applications.
Central Petroleum Limited (ASX:CTP) (FRA:C9J) (OTCMKTS:CNPTF) advises that the first of two Mereenie development wells, WM29, was successfully air-drilled and completed across the Pacoota-3 sandstones.
Empire Energy Group Limited (ASX:EEG) (OTCMKTS:EEGUF) is pleased to announce that the C-5H well, targeting the Velkerri-B shale formation, reached a total length of 5,310 metres (17,421 feet) on 20 December 2024.
Tamboran Resources Corporation's (ASX:TBN) (NYSE:TBN) (OTCMKTS:TBNNY) Shenandoah South 3H (SS-3H) well was successfully drilled, cased and cemented with 5-1/2- inch casing to a measured depth of 21,169 feet (6,452 metres) within Beetaloo Basin exploration permit EP 98.
Tamboran Resources Corporation (ASX:TBN) (NYSE:TBN) (OTCMKTS:TBNNY) and Daly Waters Energy, LP have entered into binding agreements with APA Group whereby APA will build, own and operate the 12-inch diameter Sturt Plateau Pipeline for the proposed Shenandoah South Pilot Project.