Empire Energy Group Ltd (ASX:EEG) Beetaloo Flow Testing and Operations Update and Conference Call
Empire Energy Group Ltd (ASX:EEG) (OTCMKTS:EEGUF) report that the Carpentaria-3H ("C-3H") has been flow tested for 27 days and is currently shut in for soaking (the practice of shutting in a well for a period following fracture stimulation to maximise long-term productivity).

















