Gas & Oil

Central Petroleum Limited (ASX:CTP) Amadeus Basin Farmout Update

🕔10/12/2022 9:06:04 AM

Central Petroleum Limited (ASX:CTP) (FRA:C9J) (OTCMKTS:CNPTF) refers to its announcements regarding the Peak Helium farmout transaction.

Read Full Article

Tamboran Resources Limited (ASX:TBN) Update on the Acquisition of Origin's Beetaloo Assets

🕔10/12/2022 8:33:34 AM

Tamboran Resources Limited (ASX:TBN) Update on the Acquisition of Origin's Beetaloo Assets

Read Full Article

BPH Energy Limited (ASX:BPH) Placement Completed to Fund Hydrogen and Gas Strategy

🕔10/11/2022 10:31:48 AM

BPH Energy Limited (ASX:BPH) is pleased to announce that it has received binding commitments to raise approximately $1.196 million. The Placement will comprise the issue of 66,494,825 new fully paid ordinary shares in the Company at an issue price of $0.018 per share.

Read Full Article

Central Petroleum Limited (ASX:CTP) Palm Valley 12 Drilling Update

🕔10/11/2022 9:16:52 AM

Central Petroleum Limited (ASX:CTP) (FRA:C9J) (OTCMKTS:CNPTF) advises that as at 0600 hrs ACST on 10 October 2022 the Palm Valley 12 (PV12) sidetrack (ST2) in OL3 was undergoing clean-up flows in preparation for a further flow test.

Read Full Article

State Gas Limited (ASX:GAS) St Baker Group Strategic Investment and Associated Placement

🕔10/10/2022 9:41:31 AM

State Gas Limited (ASX:GAS) (OTCMKTS:STGSF) is pleased to advise that it has attracted strategic investment from leading energy sector experts and undertaken an associated equity raising to help accelerate production from its east coast gas projects.

Read Full Article

Tamboran Resources Limited (ASX:TBN) EP 136 Operational Update

🕔10/7/2022 9:52:06 AM

Tamboran Resources Limited (ASX:TBN) (OTCMKTS:TBNRF) advise that the Maverick 1V (M1V) vertical well, drilled within Tamboran's 100 per cent owned and operated Beetaloo Basin permit, EP 136, has safely reached a total depth (TD) of 3,050 metres.

Read Full Article

State Gas Limited (ASX:GAS) First Lateral at Rougemont-3 Reaches Target Extent

🕔10/4/2022 9:53:56 AM

State Gas Limited (ASX:GAS) (OTCMKTS:STGSF) is pleased to advise that the first lateral of the Rougemont-3 horizontal well has reached its full target length of approximately 1,300 metres with 97.8% (1,263.3 m) within the target coal seam.

Read Full Article