🕔9/24/2012 11:25:50 AM
MEO Australia Limited (ASX:MEO) (OTCQX:MEOAY) advises that the Hercules #208 rig arrived at the Gurame SE-1X location on Friday 21st September. The well was spudded at 0600 local time on 23rd September after the 30" conductor was driven to 57m below mud line. A precautionary 8 1/2" pilot hole was drilled to a depth of 202mMDRT (measured depth below rotary table) and at 0600 this morning had been opened to 26" to a depth of 144mMDRT. Hole opening to 26" will continue to 202mMDRT where 20" surface casing will be run and cemented.
Read Full Article▸