MEO Australia Limited (ASX:MEO) Heron South-1 Progress Report No. 14
The well is interpreted to have intersected two gross sandstone intervals of approximately 120m and 115m thickness separated by approximately 130m of shale and silt. Eni has advised that it intends to carry out two separate production tests to determine reservoir productivity and gas composition of each interval.