Adelaide, Nov 6, 2008 AEST (ABN Newswire) - Beach Petroleum Limited (ASX:BPT)(PINK:BEPTF) announce the drilling report for the week ending ending 5 November 2008

The drilling report and well location map for the week ending 5 November, 2008 are attached. Highlights of the week's activities include:

Cooper/Eromanga Oil

In areas operated by Santos, two wells were successful (Tickalara-20, Beach 30.00% and Jackson South-16, Beach 38.50%).

Beach Petroleum Operated Cooper / Eromanga Exploration

Brownlow-1 (PEL 106FI, Beach 50.00%) is to be cased and suspended as a future gas / condensate producer with wireline logs showing a well developed, 7 metre gas saturated Middle Patchawarra Formation sand. Pressure data indicates a column height of approximately 30 metres, a significant result. The sand quality is similar to highly productive sands in nearby wells Middleton-1 and Raven-1, with testing deemed unnecessary. A separate basal Patchawarra sand was tested, but proved to be of poor quality.

Following the completion of Brownlow-1, the Ensign 30 rig will be moved to Canunda-1, (PEL 106FI, Beach 50.00%), 11.5 km to the north of the Brownlow-1 location. Canunda-1 will be targeting liquids rich Patchawarra Formation gas within a fault dependant closure on the western margin of the highly productive Patchawarra Trough.

Bass Basin - Offshore Tasmania: PeeJay-1 (T/39P)

Repairs to the West Triton jack-up rig are progressing well, with the rig expected to be back on the PeeJay-1 location by mid November.
----------------------------Well            Participants----------------------------PeeJay-1        BPT*    50.00%T/39P           BEN     50.00%Oil ExplorationBass Basin, Tas.---------------------------------------------------------------Weekly Progress & Summary                       Primary Targets---------------------------------------------------------------Report Time:    0600 (AEST) 05/11/2008          Upper Eastern Depth:          0m                      View GroupOperation:      Rig repairs.                                    Progress:       0m   ----------------------------Well            Participants----------------------------  Brownlow-1      BPT*    50.00%  PEL106 (Farmin Block)  DLS     50.00%  Gas Exploration                                  C/E Basin, SA                                                   DST-1 in the Patchawarre (2722.0m-2721.5m) reversed out 8.4 bbls of gasified water cushsion.---------------------------------------------------------------Weekly Progress & Summary                       Primary Targets---------------------------------------------------------------Report Time:    0600 (CST) 05/11/2008           Patchawarra FmDepth:          2785m (TD)                      Operation:      Well to be cased and suspended as a                 future Patchawarra Formation gas producer.Progress:       265m                    ----------------------------Well            Participants----------------------------  Yawa-2          BPT     23.20%  PL 111          STO*    60.06%  Gas Development ORG     16.74%                         C/E Basin, QLD                                       ---------------------------------------------------------------Weekly Progress & Summary                       Primary Targets---------------------------------------------------------------Report Time:    0600 hrs (CST) 05/11/2008       Patchawarra FmDepth:          2625m (TD)                      Operation:      Well has been cased and suspended as a                 future Patchawarra gas producer.   Progress:       0m                      ----------------------------Well            Participants----------------------------  Big Lake-91     BPT     20.21%  PPL11           STO*    66.60%  Gas Development ORG     13.19%        C/E Basin, SA                   ---------------------------------------------------------------Weekly Progress & Summary                       Primary Targets---------------------------------------------------------------Report Time:    0600 hrs (CST) 05/11/2008       Patchawarra FmDepth:          3115m [3013m TVD] (TD)          Tirrawarra Sst (s)Operation:      Well is to be cased as a future gas producer.Progress:       664m                    ----------------------------Well            Participants----------------------------  Tickalara-20    BPT     30.00%  PL 34           STO*    70.00%  Oil Appraisal                                  C/E Basin, Qld                  ---------------------------------------------------------------Weekly Progress & Summary                       Primary Targets---------------------------------------------------------------Report Time:    0600 hrs (CST) 05/11/2008       McKinlay MemDepth:          1422m (TD)                      Other Jurassic(S)Operation:      Well has been cased and suspended                 as a future McKinlay                Member oil producer.                    Progress:       0m                                                                                      ----------------------------Well            Participants----------------------------  Jackson South-16BPT     38.50%  PL 24           STO*    55.50%  Oil Development IOR     2.00%                                   C/E Basin, Qld  DLS     2.00%                          AGF     2.00%   ---------------------------------------------------------------Weekly Progress & Summary                       Primary Targets---------------------------------------------------------------Report Time:    0600 hrs (CST) 05/11/2008       Westboure FmDepth:          1594m (TD)                      mid Birkhead Fm Operation:      Well has been cased and suspended                       as a future Birkhead            Hutton Sst                   Formation and Hutton Sandstone oil producer.Progress:       298m                                     --------------------------------COAL SEAM GAS PROJECTS          Location            Participants--------------------------------Location        Participants                 Pl 198          BPT     40%          Coal Seam Develop't       AOE*    60%     Surat  Basin, QLD               --------------------------------------------------------------------Well         Depth       Operation: 0600hrs (EST) 05th November 2008 --------------------------------------------------------------------Tipton-138   523.66m Completed well and moving to Tipton 139  Tipton-139   311.0m  Drilling ahead in main hole.                    * Operator                            (s)  Secondary Targets                 ASX:BPT  Beach Petroleum Ltd               ASX:STO  Santos Limited         ASX:AOE  Arrow Energy NL            ASX:ORG  Origin Energy Resources LTDASX:AGF  Australian Gas Fields LTD  ASX:BEN  Benaris Petroleum N.VASX:DLS  Drillsearch Energy   ASX:IOR  Inland Oil Resources

Contact

Reg Nelson
Beach Petroleum
08 8338 2833

Mark Lindh
Adelaide Equity
0414 551 361

Ian Howarth
Farrington National
03 9223 2455


ABN Newswire
ABN Newswire This Page Viewed:  (Last 7 Days: 8) (Last 30 Days: 16) (Since Published: 1515)