Empire Oil & Gas Nl Stock Market Press Releases and Company Profile

Perth, Feb 29, 2008 AEST (ABN Newswire) - Empire Oil & Gas N.L. (ASX: EGO) Drilling Progress Report dated 29 February 2008 for the Period 0600 hrs 28 February 2008 to 0600 hrs 29 February 2008. During the 24-hour period drilled ahead 8 1/2" hole from 1913m to 1996m.

Future Operations: Drill ahead to the Cattamarra reservoir objectives.

MORIARY-1 PETROLEUM EXPLORATION WELL EP 426 NORTH PERTH BASIN WESTERN AUSTRALIA

1. Well Name/Permit Moriary-1/EP 426, North Perth Basin, Western Australia

2. This Report is for the Period: The 24 hour period 0600 hours WST 28 February 2008 to 0600 WST 29 February 2008

3. This ASX Release Time and Date: 0930 hours 29 February 2008

4. Report No: 14

5. Spud Date/Rig: 1300 hours 12 February 2008/ADS Rig 6

6. Days since Spud: 17

7. Location of Well: Latitude 290 17' 01.469" S/Longitude 1150 20' 19.081" E

8. Elevation: G.L. 178.32 metres RKB: 182.64m

9. Total Depth: 2550m RKB

10. Targets: Cattamara Coal Measures.

11. Present Depth: 1996 metres at 0600 hours, 29 February 2008.

12. Geological Summary: At 2400 hours 28 February 2008 (the rig reporting period)

Yarragadee Formation:

1885m-1980m Sandstones and interbedded claystones with thin coal seams

13. Operations since last Report: Drilled ahead from 1913m to 1996m at 0600 hours, 29 February 2008

14. Current Operations: Drilling ahead at 1996m @ 0600 hours, 29 February2008.

15. Future Operations: Drill ahead in 8 1/2" hole from 1996 metres to reservoir objectives in the Cattamarra.

16. Hydrocarbon Indications: Gas: 1885m to 1980m. Background Gas Maximum 5 units in Yarragadee with C1 137 to 841 ppm C1.

17. Prospect Description: The Moriary Prospect is an anticlinal structure, similar to the Mt Horner Oilfield with reservoir objectives the 'F', 'J' and 'L' Sands of the Jurassica-aged Cattamarra Coal Measures. Potential recoverable oil reserves are estimated to be 'F' Sands 3 million barrels, 'J' Sands 4 million barrels and 'L' Sands 4 million barrels.

18. Participants in the well:

Empire Oil & Gas N.L. (Operator) - 40%
Allied Oil & Gas Plc - 25%
Black Fire Energy Limited - 10%
ERM Gas Pty Ltd - 25%

19. Comment: Note 1: Structural closure interpreted to be beneath 2000 metres RKB.

Contact

Empire Oil & Gas N.L.
Managing Director
Mr Craig Marshall
TEL: +61-8-6389-2687


ABN Newswire
ABN Newswire This Page Viewed:  (Last 7 Days: 2) (Last 30 Days: 13) (Since Published: 1163)