Indago Energy Ltd

ASX:INK ISIN:AU000000INK8

Indago Energy Limited ASX INKIndago Energy Ltd (ASX:INK) (OTCMKTS:POGLY) is an Australian listed company engaged in oil and gas exploration, development and production. Indago's project portfolio includes liquid rich producing assets together with substantial oil development and exploration acreage in the United States.

The Company's Exploration and Production focus is on high growth oil and gas projects offering scalability of production, cash flows and reserves. Indago currently has several producing projects together with a significant acreage position. The Company's immediate focus is the development of its Capitola Oil Project located in an active region of the Cline Shale resource play along the Eastern Shelf of the Permian Basin, Texas. The project's core development and exploitation opportunities are shallower multiple "stacked" sandstones and limestones to depths of 7,000 feet which are effectively produced from vertically drilled wells. Indago's value driven model is executed through exploiting shallower, well defined intervals with advanced completion and stimulation technology within known produced oil fields together with exposure to the emerging Cline Shale resource play.

Indago's shares are publicly traded on the Australian Securities Exchange (ASX ticker: INK) and also as American Depositary Receipts on the OTCQX (ADR ticker: POGLY).

 
   

News

Pryme Energy Limited (ASX:PYM) Rosewood Plantation 21H No.1 Drilling Update

🕔1/22/2013 10:59:15 AM 2894

Pryme Energy Limited's (ASX:PYM) Rosewood Plantation 21H No.1 well continues drilling horizontally and is currently at a measured depth of 17,650 feet (5,380 metres). The planned total measured depth of the well is 20,310 feet (6,190 metres) with drilling expected to be completed within the next 10 days. A slotted or perforated production liner will be installed once drilling of the lateral is complete; this will be followed by production flow testing.

Read Full Article

Pryme Energy Limited (ASX:PYM) Rosewood Plantation 21H No.1 Drilling Update

🕔1/15/2013 12:20:41 PM 2838

Pryme Energy Limited's (ASX:PYM) Rosewood Plantation 21H No.1 well is now drilling horizontally and intersecting oil and gas bearing fractures. The well has reached a measured depth of 17,300 feet (5,273 metres), an advance of 1,800 feet (550 metres) over the past week.

Read Full Article

Pryme Energy Limited (ASX:PYM) Rosewood Plantation 21H No.1 Drilling Update

🕔1/8/2013 10:11:44 AM 2816

Pryme Energy Limited (ASX:PYM) Rosewood Plantation 21H No.1 well has reached a total measured depth of 15,501 feet (4,724 metres). Building the radius to establish the horizontal leg of the well in the Austin Chalk formation is almost complete with the final few degrees of the radius to be drilled with a rotary steerable drilling assembly. This drilling assembly will also be used to drill the remainder of the lateral which should begin in the next few hours.

Read Full Article

Pryme Energy Limited (ASX:PYM) Rosewood Plantation 21H No.1 Drilling Update

🕔1/2/2013 9:26:04 AM 2617

Pryme Energy Limited (ASX:PYM) (OTCQX:POGLY) announces that the Rosewood Plantation 21H No.1 well has reached a total measured depth of 15,312 feet (4,667 metres).

Read Full Article

Pryme Energy Limited (ASX:PYM) Pryme Successfully Completes Placement

🕔12/17/2012 4:29:02 PM 2794

Pryme Energy Limited (ASX:PYM) is pleased to announce that it has raised $1,308,000 through a placement of 16.35 million new ordinary shares, at a price of $0.08 per share, and 8.175 million options on the basis of one free option for every two new shares. The options have a $0.15 exercise price and will expire on 30 November 2013.

Read Full Article

Pryme Energy Limited (ASX:PYM) Intermediate Casing Successfully Installed at Turner Bayou Chalk Project

🕔12/17/2012 9:24:46 AM 2900

Pryme Energy Limited (ASX:PYM) announce that the intermediate casing in the vertical section of the Rosewood Plantation 21H No.1 well has been successfully run and cemented into the top of the Austin Chalk formation at a total measured depth of 14,901 feet (4,542 metres). We have cemented the casing in place and plan to commence drilling out of the intermediate casing and building the radius to establish the horizontal leg of the well later this week.

Read Full Article

Pryme Energy Limited (ASX:PYM) Pryme Closes US$100m Non-Recourse Debt Facility

🕔12/13/2012 10:32:47 AM 2984

Pryme Energy Limited (ASX:PYM) is pleased to announce that its wholly-owned subsidiary Pryme Oil and Gas LLC has executed a $100,000,000 Senior Secured Term Credit Agreement (Term Facility) with Macquarie Bank Limited (Macquarie Bank) to fund its share of exploration and development costs for the Turner Bayou project in Avoyelles Parish Louisiana, USA.

Read Full Article

Pryme Energy Limited (ASX:PYM) Rosewood Plantation 21H No.1 Drilling Update

🕔12/11/2012 9:19:46 AM 2879

Pryme Energy Limited's (ASX:PYM) (OTCQX:POGLY) Rosewood Plantation 21H No.1 well has reached a total vertical depth of 14,905 feet (4,540 metres) into the top of the Austin Chalk formation. We are currently working our way out of the hole following a scheduled conditioning run which is designed to clean the hole prior to running the intermediate casing.

Read Full Article

Pryme Energy Limited (ASX:PYM) Rosewood Plantation 21H No.1 Drilling Update

🕔12/4/2012 10:58:59 AM 2405

Pryme Energy Limited's (ASX:PYM) (OTCBB:POGLY) Rosewood Plantation 21H No.1 well has reached a total vertical depth of 14,905 feet (4,540 metres) into the top of the Austin Chalk formation. The next stage of operations involves installation and cementing the intermediate casing which will run from the surface to just below the top of the Austin Chalk. Following this, drilling of the planned 5,000 foot (1,524 metre) lateral within the Austin Chalk formation, at a total vertical depth of 15,380 feet (4,687 metres), will commence.

Read Full Article

Pryme Energy Limited (ASX:PYM) Rosewood Plantation 21H No.1 Drilling Update

🕔11/26/2012 10:35:23 AM 2283

Pryme Energy Limited's (ASX:PYM) Rosewood Plantation 21H No.1 well has been successfully deviated at a depth of approximately 4,000 feet and is drilling ahead at 6,280 feet (1,914 metres) towards the top of the Austin Chalk formation.

Read Full Article
###

93,765 COMPANY PROFILE VIEWS

  • This Page Viewed: (Last 7 Days: 278) (Last 30 Days: 787) (Since Published: 93765) 

Company Data

    Headquarters
  • Level 6
    412 Collins Street
    Melbourne, Victoria, 3000
    Australia
  • Telephone
  • +61-3-9642-2899 
  • Fax
  • +61-3-9642-5177 
  • Principal Sector
  • Energy 
  • Principal Industry
  • Energy 
  • Homepage
  • www.pryme-energy.com

Company Reports

Audio Interview

Presentations

Download Presentation

Quarterly Report

Download Presentation

Social Media