Empire Oil & Gas Nl

ASX:EGO ISIN:AU000000EGO3

 Empire Oil & Gas NL is an Australia-based company that is principally engaged in oil and gas production and exploration.  
 

News

Empire Oil & Gas (ASX:EGO) STAR FINCH-1, EP 460, Petroleum Drilling Progress Report No 11

🕔7/22/2008 12:26:39 PM 1628

Empire Oil & Gas (ASX:EGO)(PINK:EOLGF) Announce the current operations at the Star Finch-1 well as of 2400 hours 21 July, drilling ahead in 8 1/2" hole at 233 metres. The current operations at the Star Finch-1 well at 0900 hours on 22 July 2008; drilling ahead in 8 1/2" hole at 295 metres to reservoir objectives.

Read Full Article

Empire Oil & Gas (ASX:EGO) STAR FINCH-1, EP 460, Petroleum Drilling Progress Report No 10

🕔7/21/2008 11:52:30 AM 1651

Empire Oil & Gas (ASX:EGO)(PINK:EOLGF) Announce the current operations at the Star Finch-1 well as of 2400 hours 20 July, completed pressure testing, ran in the hole with 8 1/2" bottom hole drilling assembly.

Read Full Article

Empire Oil & Gas (ASX:EGO) STAR FINCH-1, EP 460, Petroleum Drilling Progress Report No 9

🕔7/18/2008 1:56:39 PM 1489

Empire Oil & Gas (ASX:EGO)(PINK:EOLGF) Announce the current operations at the Star Finch-1 well as of 2400 hours 17 July, continuing pressure testing.

Read Full Article

Empire Oil & Gas (ASX:EGO) STAR FINCH-1, EP 460, Petroleum Drilling Progress Report No 8

🕔7/17/2008 1:52:18 PM 1498

Empire Oil & Gas (ASX:EGO)(PINK:EOLGF) Announce the current operations at the Star Finch-1 well as of 2400 hours 16 July, completed the installation of blow out prevention equipment and commenced pressure testing.

Read Full Article

Empire Oil & Gas (ASX:EGO) STAR FINCH-1, EP 460, Petroleum Drilling Progress Report No 7

🕔7/16/2008 12:55:29 PM 1396

Empire Oil & Gas (ASX:EGO)(PINK:EOLGF) Announce the current operations at the Star Finch-1 well as of 2400 hours 15 July, finalising the installation of blow out prevention equipment. The current operation at the Star Finch-1 well at 0900 hours on 16 July 2008 is continuing to install blow out prevention equipment and preparing to pressure test.

Read Full Article

Empire Oil & Gas (ASX:EGO) STAR FINCH-1, EP 460, Petroleum Drilling Progress Report No 6

🕔7/15/2008 11:43:36 AM 5089

Empire Oil & Gas (ASX:EGO)(PINK:EOLGF) Announce the current operations at the Star Finch-1 well as of 2400 hours 14 July, installing blow out prevention equipment.

Read Full Article

Empire Oil & Gas (ASX:EGO) STAR FINCH-1, EP 460, Petroleum Drilling Progress Report No 5

🕔7/14/2008 12:41:50 PM 1529

Empire Oil & Gas (ASX:EGO)(PINK:EOLGF) Announce the current operations at the Star Finch-1 well as of 2400 hours 13 July, completed running the 9 5/8" casing to 114 metres, cemented and installed braden head and pressure tested.

Read Full Article

Empire Oil & Gas (ASX:EGO) STAR FINCH-1, EP 460, Petroleum Drilling Progress Report No 4

🕔7/11/2008 12:00:13 PM 1733

Empire Oil & Gas (ASX:EGO)(PINK:EOLGF) Announce the current operations at the Star Finch-1 well as of 2400 hours 10 July completed running the 9 5/8" casing to 114 metres. The current operation at the Star Finch-1 well at 0900 hours on 11 July 2008 is preparing to cement the casing and install blow out prevention equipment.

Read Full Article

Empire Oil & Gas (ASX:EGO) STAR FINCH-1, EP 460, Petroleum Drilling Progress Report No 3

🕔7/10/2008 12:33:10 PM 1569

Empire Oil & Gas (ASX:EGO)(PINK:EOLGF) Announce the current operations at the Star Finch-1 well at 0900 hours on 10 July 2008 is preparing to run the 244mm (9 5/8") casing and cement and install blow out prevention equipment.

Read Full Article

Empire Oil & Gas (ASX:EGO) STAR FINCH-1, EP 460, Petroleum Drilling Progress Report No 2

🕔7/9/2008 12:38:43 PM 5039

Empire Oil & Gas (ASX:EGO)(PINK:EOLGF) Announce the current operations at the Star Finch-1 well at 0900 hours on 9 July 2008 is drilling ahead in 311mm (12 1/4") hole at 55 metres depth. Planned operations in the next 24 hours, will be drilling ahead in 12 1/4" hole to approximately 100 metres where the 244mm (9 5/8") casing will be run and cemented. This 'top hole' drilling operation will be undertaken only in daylight hours.

Read Full Article
###

15,873 COMPANY PROFILE VIEWS

  • This Page Viewed: (Last 7 Days: 59) (Last 30 Days: 266) (Since Published: 15873) 

Company Data

    Fax
  • (08) 9385 3821 
  • Principal Sector
  • Energy 
  • Principal Industry
  • Energy 
  • Listed
  • 1998/01/15 
  • Homepage
  • www.empireoil.com.au