Central Petroleum Limited Stock Market Press Releases and Company Profile
Santos to Proceed with Stage 3 of Southern Amadeus Farmout
Santos to Proceed with Stage 3 of Southern Amadeus Farmout

Brisbane, Oct 31, 2018 AEST (ABN Newswire) - Central Petroleum Limited (googlechartASX:CTP) ("Company" or "Central") announces that Santos has completed the seismic works as part of the Southern Amadeus Stage 2 farmout through the acquisition of 1,337 line km in EP82, EP112 and EP125.

Santos has elected to proceed to Stage 3 of the Southern Amadeus Farmout with Central by electing to drill a well in EP112 to earn a 70% participating interest in that permit. It is expected that Santos will drill the Dukas Prospect in EP112 which will be a free carry for Central under the farmout, with drilling anticipated in the first quarter of 2019. The Dukas prospect was delineated with the seismic campaign in 2013 and further seismic data acquisition in 2017 and 2018.

If successful, the Dukas Prospect could contain multiple Trillion Cubic Feet (TCF) of gas. Two other wells in the Southern Amadeus Basin (Mt Kitty and Magee) have demonstrated a hydrocarbon system exists. Further, the presence of helium and hydrogen offers potential value add. Please see attached information extracted from Santos' 2018 Investor Day Pack (page 78) 1. A successful development could facilitate a Moomba pipeline connection.

Santos has elected to remain at a 40% participating interest in EP82, EP105 and EP106 2 with no further farmout works to be completed. Central will retain a 60% participating interest in these permits.

Endnotes:

1. Subject to the "Disclaimer and important notice" in that presentation.

2. Santos (as Operator) has continued the process of an application with the NT Department of Primary Industry and Resources for consent to surrender Exploration Permit 106.

To view figures, please visit:
http://abnnewswire.net/lnk/9YQ47B75


About Central Petroleum Limited

Central Petroleum LimitedCentral Petroleum Limited (ASX:CTP) is a well-established, and emerging ASX-listed Australian oil and gas producer. In our short history, Central has grown to become the largest onshore gas producer in the Northern Territory (NT), supplying industrial customers and senior gas distributors in NT and the wider Australian east coast market.

Central is positioned to become a significant domestic energy supplier, with exploration and development plans across 180,000 km2 of tenements in Queensland and the Northern Territory, including some of Australia's largest known onshore conventional gas prospects. Central has also completed an MoU with Australian Gas Infrastructure Group (AGIG) to progress the proposed Amadeus to Moomba Gas Pipeline to a Final Investment Decision.

We are also seeking to develop the Range gas project, a new gas field located among proven CSG fields in the Surat Basin, Queensland with 135 PJ (net to Central) of development-pending 2C contingent resource.

abnnewswire.com 


Contact

Investor and Media Inquiries:
Greg Bourke: +61-478-318-702
Sarah Morgan: +61-421-664-969



ABN Newswire
ABN Newswire This Page Viewed:  (Last 7 Days: 13) (Last 30 Days: 35) (Since Published: 5229)