Authier Lithium Project Pre-Feasibility Study
Authier Lithium Project Pre-Feasibility Study

Brisbane, Aug 29, 2016 AEST (ABN Newswire) - Sayona Mining Limited (googlechartASX:SYA) (googlechartDMNXF:OTCMKTS) ("Sayona" or the "Company") is pleased to announce the commencement of the Authier Pre-Feasibility Study ("PFS").

The PFS will assess the development potential of a simple, low strip ratio, open-cut mining operation and processing facility producing spodumene concentrate.

Highlights:

- New phase of development with the commencement of a PFS, results due in 4th quarter 2016

- PFS to determine optimal project configuration, capital and operating costs

- Authier project benefits from excellent supporting infrastructure, well understood mining and metallurgical characteristics

The PFS will be prepared by SGS Canada and Bumigeme who together have significant experience and expertise in all aspects of lithium resource definition, mining, processing and infrastructure requirements in Quebec. The PFS will assess the technical and economic viability of developing the Authier project, and expands on the Authier NI43-101 Technical Report, Preliminary Economic Assessment, completed in 2013.

The PFS will be based on a JORC Mineral Resource derived from 123 diamond historical drill holes totalling about 15,000 metres, and more than 2,143 assays for lithium. The independently prepared Authier JORC Mineral Resource, is summarised in Table 1 (see link below).

The PFS will also draw on three other work programs currently underway, including:

1. A metallurgical study at SGS Lakefield to provide new data for process engineering studies. This will include flotation and dense media separation testing;

2. A process engineering study to identify enhancements and optimisation of the process flow-sheet, and to estimate the capital and operating costs; and

3. A resource definition and extension drilling program, including an updated JORC mineral resource estimate.

Corey Nolan, Chief Executive Officer, commented "The PFS will provide important technical and financial information about the project for shareholders, and supporting discussions with potential of-takers, equipment suppliers, financiers and regulatory organisations. On completion of the PFS, the Company plans to progress towards completing a Definitive Feasibility Study, Mining Licence applications, and product offtake contracts".

Key components of the PFS will, include:

- Geological and geotechnical characterisation and resource assessment;

- Mine plan and design;

- Process plant design;

- Infrastructure requirements, including transport, power and water supply; and

- Market assessment and financial evaluation.

The PFS will identify the optimal project configuration, capital and operating costs, and the single go forward scenario for the Definitive Feasibility Study to be completed in the first half of 2017. The PFS study results are expected to be available in the 4th quarter 2016.

The Company believes that the feasibility of developing an operation to extract the Authier lithium resource has a number of distinctive competitive advantages which will form the basis of a fast-tracked PFS:

- Simple low-cost mining operation at low waste stripping ratio;

- Proven processing methodology from extensive testing, based on simple spodumene mineralogy, including recovery into saleable spodumene concentrate; and

- Unique position in respect of development infrastructure including roads, power, water, rail, gas, and labour.

Other Project Related Activities

In parallel with the fast-tracked PFS work program, the Company is working with a number of consulting groups to establish work programs for environmental permitting, indigenous and community relations, and the mining license application.

The Company is also continuing discussions with parties interested in securing a highquality spodumene concentrate for further processing into value-added products for the global battery markets.

To view tables and figures, please visit:
http://abnnewswire.net/lnk/TR0RB11L


About Sayona Mining Limited

Sayona Mining LtdSayona Mining Limited (ASX:SYA) (OTCMKTS:SYAXF) is a North American lithium producer with projects in Quebec, Canada and Western Australia. In Quebec, Sayona's assets comprise North American Lithium together with the Authier Lithium Project and its emerging Tansim Lithium Project, supported by a strategic partnership with American lithium developer Piedmont Lithium Inc. (ASX:PLL). Sayona also holds a 60% stake in the Moblan Lithium Project in northern Quebec.

In Western Australia, the Company holds a large tenement portfolio in the Pilbara region
prospective for gold and lithium. Sayona is exploring for Hemi-style gold targets in the world-class Pilbara region, while its lithium projects include Company-owned leases and those subject to a joint venture with Morella Corporation (ASX:1MC). 

 

https://twitter.com/SayonaMining https://www.linkedin.com/company/sayona-mining-limited/ abnnewswire.com 


Contact

Corey Nolan
Chief Executive Officer
Phone: +61-7-3369-7058
Email: info@sayonamining.com.au
www.sayonamining.com.au



ABN Newswire
ABN Newswire This Page Viewed:  (Last 7 Days: 7) (Last 30 Days: 24) (Since Published: 3358)