Beach Energy Limited Stock Market Press Releases and Company Profile
Beach Petroleum Limited (ASX:BPT) Weekly Drilling Report Week ending 5 August 2009
Beach Petroleum Limited (ASX:BPT) Weekly Drilling Report Week ending 5 August 2009

Adelaide, Aug 6, 2009 AEST (ABN Newswire) - Beach Petroleum Limited (ASX:BPT)(PINK:BEPTF) announces the drilling report for the week ending 22 July, 2009.

Beach Petroleum Operated Cooper / Eromanga Exploration

Murninnie-1 (PEL 92, Beach 75%), has been plugged and abandoned. The Ensign 30 rig is being moved to the Chiton-1 well location in adjacent Licence PEL 91. Chiton-1 is expected to spud on 8 August. Participants in Chiton-1 are Beach Petroleum Ltd, 40% and Drillsearch Energy Ltd, 60%.

Cooper/Eromanga Oil Exploration and Development - Santos Operated

In areas operated by Santos, Charo-4 (Beach 20.21%) has been plugged and abandoned.

Arrowie Basin (South Australia) - Paralana-2 Geothermal Exploration Well

The Paralana-2 geothermal exploration well (Beach earning 21%) is at a depth of 1116 metres. Casing has been installed to section TD. The current operation is installing blowout preventers prior to drilling ahead.

Browse Basin, Offshore Western Australia - Burnside 1ST1 Gas Exploration Well

Burnside-1ST1 (Beach 7.34%) has reached total depth of 4182 metres. The current operation is continuing an evaluation of the primary reservoir objective.

Basker - Manta - Gummy (BMG) Oil Field Development - Gippsland Basin

Basker-7 (Beach 30%) is drilling ahead at a depth of 3920 metres.
---------------------------------Well               Participants---------------------------------Murninnie-1        BPT*    75.00%  PEL 92             COE     25.00%  Oil ExplorationC/E Basin, SA-------------------------------------------------------Weekly Progress & Summary            Primary Targets-------------------------------------------------------Report Time: 0600 (CST) 05/08/2009   Namur SandstoneDepth:       2051m MD (TD)           Birkhead FormationOperation:   Well has been  plugged             and abandoned.Progress:    652m-------------------------------------Well                    Participants--------------------------------------Paralana-2              BPT*    21.00%  GEL 178                 PTR     69.00%  Geothermal Exploration  TRU     10.00%Arrowie Basin, SA-------------------------------------------------------Weekly Progress & Summary              Primary Targets-------------------------------------------------------Report Time: 0600 hrs (CST)05/08/2009  Upper Cannana                                           Depth:       1116m                     or Bolla BollanaOperation:   Installing blowout             preventers prior to             drilling ahead.Progress:    47m---------------------------------Well               Participants---------------------------------Burnside-1ST1      BPT      7.34%   WA 281P(offshore)  STO*    47.83%  Gas Exploration    IBL     20.00%  Browse Basin, WA   CVX     24.83%  -------------------------------------------------------Weekly Progress & Summary              Primary Targets-------------------------------------------------------Report Time: 0500 hrs (WST)04/08/2009  Lower CretaceousDepth:       4182m (TD)Operation:   Rigging up sidewall             core tool.Progress:    333m---------------------------------Well               Participants---------------------------------Basker-7           BPT     30.00%  Vic L26            ROC*    30.00%  Development        CIE     20.00%  Gippsland Basin,   SJE     10.00%  VIC                PTM     10.00%------------------------------------------------------Weekly Progress & Summary              Primary Targets------------------------------------------------------Report Time: 800 hrs (CST) 5/08/2009   Latrobe GroupDepth:       3920mOperation:   Drilling ahead.Progress:    1408m---------------------------------Well               Participants---------------------------------Charo-4            BPT     20.21%  PPL 177            STO*    66.60%  Oil Appraisal      ORG     13.19%  C/E Basin, SA---------------------------------------------------------Weekly Progress & Summary              Primary Targets---------------------------------------------------------Report Time: 0600 hrs (CST)05/08/2009  Birkhead FormationDepth:       2136m (TD)                Hutton SandstoneOperation:   Well has been plugged     Namur Sandstone             and abandoned.Progress:    316m---------------------------------Well               Participants---------------------------------Wackett-15         BPT     23.20%  PL 62              STO*    60.06%  Gas Development    ORG     16.74%  C/E Basin, QLD------------------------------------------------------Weekly Progress & Summary              Primary Targets------------------------------------------------------Report Time: 0600 hrs (CST)05/08/2009  Toolachee FmDepth:       2002m (TD)Operation:   Well has been cased and             suspended as a future             Toolachee Formation             gas producer.Progress:    666m* Operator(s)   Secondary TargetsBPT   Beach Petroleum LtdIBL   INPEX Browse, Ltd.ROC   Roc Oil            CIE   Cieco Exl & ProdORG   Origin Energy Resources LtdSJE   Sojitz Energy             COE   Cooper EnergyPTM   Pertamina STO   Santos Limited           CVX   Chevron Australia Pty Ltd PTR   Petratherm Ltd  TRU   TRUenergy Pty Ltd

Contact

Hector Gordon
Chief Operating Officer
TEL: +61-8-8338-2833



ABN Newswire
ABN Newswire This Page Viewed:  (Last 7 Days: 9) (Last 30 Days: 28) (Since Published: 6032)